Terms of Service
Effective Date: 01-JAN-2025
Last Updated: 20-AUG-2025
Introduction
These Terms of Service ("Terms") govern the contractual relationship between Blackwell Masonry ("Company," "we," "our," or "us") and our clients ("Client," "you," or "your") for all masonry, parging, and related construction services. By engaging our services, you agree to be bound by these Terms.
Service Scope and Limitations
General Construction Conditions
Our masonry and parging services are performed with professional care and industry-standard practices. However, clients acknowledge that construction work inherently involves certain unavoidable conditions that may affect the surrounding environment.
Environmental Impact Limitations
Dust and Debris: Construction activities naturally generate dust and debris. We implement dust control measures where feasible; however, we cannot be held responsible for dust accumulation during normal construction operations.
Landscaping and Property Elements:
Minor impacts to grass and vegetation within two feet of the foundation work area are considered normal
Minor surface scratches to eavestroughs and aluminum siding may occur during standard operations
We exercise reasonable care to minimize damage to existing landscaping and structures
Protective Measures: We are committed to maintaining clean worksites and will implement reasonable protective measures, including the use of plywood, tarps, and other protective materials around work areas.
Specialized Service Conditions
Parging and Foundation Work
Foundation Movement Warranty Void: Our warranty becomes void if foundation movement occurs due to:
Excavation activities within 10 feet of the foundation
Natural foundation settling or movement
Ground vibrations caused by external construction activities
Such conditions are beyond our control and may result in hairline cracks or other surface irregularities.
Brick Repointing Services
Mortar Color Matching: While we strive for optimal color matching, we cannot guarantee exact replication of original mortar colors due to:
Age-related color variations in existing mortar
Natural variations in cement and sand materials
Environmental factors affecting mortar appearance over time
Dust Management: Brick repointing generates significant dust. We strongly recommend clients:
Close all windows and doors during work periods
Notify neighboring properties of scheduled work
Remove or cover sensitive items in work areas
Brick Removal and Installation
Underground Utilities: Clients are responsible for:
Identifying and marking all underground utilities before work commencement
Providing utility location services when required
Notifying the Company of any known utility locations
We are not liable for damage to unmarked utilities, including electrical cables, gas lines, or other underground services.
Metal Roofing Considerations
For projects involving work near metal roofing, we recommend engaging a qualified roofing contractor to temporarily remove metal sections in the work area. While we implement protective measures, we cannot guarantee prevention of minor dents or surface impacts to metal roofing materials during construction activities.
Force Majeure and Supply Chain
Due to circumstances beyond our control, including but not limited to:
Global pandemic conditions (such as COVID-19)
Supply chain disruptions
Material shortages
Transportation delays
Materials and supplies may experience availability issues, delays, or price fluctuations. We reserve the right to adjust project costs to reflect additional expenses incurred due to such circumstances.
Payment Terms and Conditions
Deposit Requirements
Residential Restoration Work: 25% deposit required
Commercial Projects: 50% deposit required
Work cannot commence until deposit payment is received and processed
Payment Schedule
Final payment of remaining balance is due within 14 days of project completion
Invoices will be issued prior to project start date
Late payments (after 28 days) will incur interest charges at 60% per annum on outstanding amounts
Payment Methods
Electronic Transfer:
Email: blackwellmasonry@gmail.com
Password: Parging
Physical Payments:
Address: 139 Starlight Ave, Breslau, ON N0B 1M0
Accepted: Cash, certified cheque, money order
Cancellation Policy
Cancellation Fee: Projects cancelled within 14 days of scheduled start date will incur a $250 administrative fee to cover:
Scheduling coordination costs
Material ordering and preparation expenses
Administrative processing time
Warranties and Disclaimers
Limited Warranty
We warrant our workmanship against defects in materials and labor under normal conditions, subject to the limitations outlined in these Terms.
Warranty Exclusions
Warranties are void under conditions including but not limited to:
Foundation movement or settling
External excavation within 10 feet of work area
Modifications made by third parties
Normal wear and aging of materials
Limitation of Liability
Our liability is limited to the value of services provided. We are not responsible for:
Consequential or indirect damages
Lost profits or business interruption
Damages exceeding the contract value
Governing Law
These Terms are governed by the laws of Ontario, Canada. Any disputes shall be resolved in the courts of Ontario.
Contact Information
Blackwell Masonry
Email: blackwellmasonry@gmail.com
Phone: 519-746-2104
Address: 139 Starlight Ave, Breslau, ON N0B 1M0
Acceptance
By signing our service agreement or authorizing work to commence, you acknowledge that you have read, understood, and agree to be bound by these Terms of Service.